Sma SB 6000TL‑US Installation User Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 92
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
SMA America, LLC 4 Mounting
Installation Manual SB6-11TL-US-IA-en-13 21
Observe recommended clearances to walls, other inverters or other objects. As a result,
sufficient heat dissipation is ensured.
If several inverters are mounted in areas with high ambient temperatures, increase the
clearances and ensure a sufficient fresh-air supply. Thus, you will prevent the inverter power
from being reduced due to too high temperatures.
Recommended clearances
The National Electrical Code
®
may stipulate greater clearances (see National Electrical
Code
®
, Section 110.26). Installations in Canada must be carried out in accordance with
the applicable Canadian standards.
Position Clearance
Top 12 in. (300 mm)
Bottom 12 in. (300 mm)
Left 12 in. (300 mm)
Right 12 in. (300 mm)
Front 2 in. (50 mm)
If the Sunny Boy is installed outdoors
Observe minimum clearance to the ground of 36 in. (900 mm).
12 in.
12 in.
2 in.
12 in.
12 in.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 91 92

Comments to this Manuals

No comments