Sma SC 500CP XT Installation User Manual Page 75

  • Download
  • Add to my manuals
  • Print
  • Page
    / 82
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 74
The minimum passage width between the open door of the inverter and the next fixed obstacle must be maintained.
The minimum passage width must comply with national standards.
Figure 26: Minimum clearances for two inverters in an electrical equipment room
Position Designation
A Minimum passage width
B Inverter
9.1.7 Grounding Concept
In accordance with the latest technology, the inverters are discharged to ground. As a result, leakage currents to
ground occur which must be taken into account when planning the PV power plant. The magnitude and distribution of
such leakage currents is influenced by the grounding concept of all devices in the PV power plant. It is therefore
recommended that e.g. for use of cameras and monitoring technology, signal transmission is executed in fiber-optic
technology. This will counteract possible interference sources.
The recommended grounding of inverter and MV transformer in meshed design reduces leakage current levels.
9 Appendix
SMA Solar Technology AG
Operating Manual 75SCCPXT-IA-E4-en-44
Page view 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 81 82

Comments to this Manuals

No comments