Summary of Contents

Page 1 - OperatingManual

OperatingManualSUNNYBOY 3000TL/ 3600TL/ 4000TL/ 5000TLSB30-50TL-21-BE-en-11 | Version 1.1AMERICAN ENGLISH

Page 2 - Legal Provisions

Danger to life due to high voltages of the PV arrayWhen exposed to sunlight, the PV array generates dangerous DC voltage which is present in theDC con

Page 3 - Table of Contents

3 Scope of DeliveryCheck the scope of delivery for completeness and any externally visible damage. Contact yourdistributor if the scope of delivery is

Page 4

4 Product Description4.1 Sunny BoyThe SunnyBoy is a transformerless PV inverter with two MPP trackers which converts the directcurrent of the PV arra

Page 5

Position ExplanationE DisplayThe display shows the current operating data and events or errors (see Sec-tion9.2 "Display Overview", page41

Page 6 - 1.3 Additional Information

Symbol ExplanationOperating principle of the ESS:• If the ESS is plugged in, the DC electric circuit is closed.• To interrupt the DC electric circui

Page 7 - 1.5 Nomenclature

Symbol ExplanationThe product is suitable for outdoor installation.Certified safetyThe product is VDE-tested and complies with the requirements of the

Page 8 - Electronic Solar Switch ESS

SMA Power Control ModuleThe SMAPowerControlModule enables the inverter to implement grid management services andis equipped with an additional mult

Page 9

5 Mounting5.1 Requirements for MountingRequirements for the mounting location:Danger to life due to fire or explosionDespite careful construction, ele

Page 10 - SMA Solar Technology AG

Dimensions for mounting:Figure 3: Position of the anchoring pointsRecommended clearances:If you maintain the recommended clearances, adequate heat dis

Page 11 - 3 Scope of Delivery

Figure 4: Recommended clearancesPermitted and prohibited mounting positions:☐ The inverter must be mounted in one of the permitted positions. This wil

Page 12 - 4 Product Description

Legal ProvisionsThe information contained in these documents is property of SMA Solar Technology AG. Anypublication, whether in whole or in part, requ

Page 13 - * Optional

Risk of injury when lifting the inverter, or if it is droppedThe inverter weighs 30 kg. There is risk of injury if the inverter is lifted incorrectly

Page 14

6 Electrical Connection6.1 Safety during Electrical ConnectionDanger to life due to high voltages of the PV arrayWhen exposed to sunlight, the PV arra

Page 15 - 4.2 Interfaces and Functions

6.2 Overview of the Connection Area6.2.1 View from BelowFigure 6: Enclosure openings at the bottom of the inverterPosition DesignationA Pin connector

Page 16 - Multifunction Relay

6.2.2 Interior ViewFigure 7: Connection areas in the interior of the inverterPosi-tionDesignationA 2 positive and 2 negative DC connectors, input AB P

Page 17 - 5 Mounting

6.3 AC Connection6.3.1 Requirements for the AC ConnectionCable requirements:☐ External diameter: 12 mm to 21 mm☐ Conductor cross-section: 1.5mm² to 1

Page 18 - Dimensions for mounting:

Grounding conductor monitoring:The inverter is equipped with a grounding conductor monitoring device. This grounding conductormonitoring device detect

Page 19 - 5.2 Mounting the Inverter

5. Loosen the screw on the display and flip the display up to have more space to make theconnection.☑ The display clicks into place.6. Unscrew the swi

Page 20

6.3.3 Connecting Additional GroundingIf additional grounding or equipotential bonding is required locally, you can connect additionalgrounding to the

Page 21 - 6 Electrical Connection

☐ The positive connection cables of the PV modules must be fitted with the positive DCconnectors (for information on assembling DC connectors, see the

Page 22 - 6.2.1 View from Below

Damage to the DC connectors due the use of contact cleaner of other cleaning agentsSome contact cleaners or other cleaning agents may contain substanc

Page 23 - 6.2.2 Interior View

Table of Contents1 Information on this Document ... 61.1 Validity...

Page 24 - 6.3 AC Connection

9.Damage to the inverter due to moisture ingressThe inverter is only properly sealed when all unused DC inputs are closed with DC connectorsand sealin

Page 25

7 Commissioning7.1 Commissioning ProcedureBefore you can commission the inverter, you must check various settings and make changes ifnecessary. This s

Page 26

Procedure:1. Determine the rotary switch position for your country and purpose. Call up the TechnicalInformation "Overview of the Rotary Switch S

Page 27 - 6.4 DC Connection

All BLUETOOTH devices in a PV system must have the same NetID. You can set a new NetID in theinverter by means of the rotary switch C.Figure 8: Positi

Page 28 - 6.4.2 Connecting the PV Array

7.4 Commissioning the InverterRequirements:☐ The inverter must be correctly mounted.☐ The circuit breaker must be correctly rated and mounted.☐ All ca

Page 29

Self-test in accordance with CEI0-21 during commissioning (applies to Italy only)The Italian standard prescribes that an inverter can only be operate

Page 30

Requirements:☐ Configured country data set: CEI0-21 Int or CEI0-21 internal or amended country data settrimmed or Specialsetting based on one of th

Page 31 - 7 Commissioning

4. If an ESS is in use, pull it out of the inverter for fiveminutes and then plug it in again firmly.5. Recommission the inverter.☑ The inverter is b

Page 32 - 7.3 Setting the NetID

8 Configuration8.1 Configuration ProcedureOnce you have commissioned the inverter, you may have to adjust various settings via the rotaryswitches in t

Page 33

2. Determine the rotary switch setting for the desired display language. Call up the TechnicalInformation "Overview of the Rotary Switch Settings

Page 34

7.2 Configuring the Country Data Set... 317.3 Setting the NetID...

Page 35 - 7.5.1 Starting the Self-Test

☐ A communication product corresponding to the type of communication used must beavailable.☐ The inverter must be registered in the communication prod

Page 36

9 Operation9.1 LED SignalsThe LEDs indicate the operating state of the inverter.LED Status ExplanationGreen LED glowing Feed-in operationIf an event o

Page 37 - Section7.5.1, page35)

There is a slot for an SD memory card on the left edge of the display enclosure. You can use the SDmemory card to carry out an inverter firmware updat

Page 38 - 8 Configuration

Position Symbol ExplanationD Active BLUETOOTH connectionQuality of the BLUETOOTH connectionActive connection to a Speedwire networkActive connection t

Page 39

Position Symbol ExplanationQ - Diagram with the power curve of the last 16feed-in hours orenergy yields of the last 16days• In order to switch betwe

Page 40

10 Disconnecting the Inverter from Voltage SourcesPrior to performing any work on the inverter, always disconnect it from all voltage sources asdescri

Page 41 - 9 Operation

13.Damage to the inverter due to electrostatic dischargeThe internal components of the inverter can be irreparably damaged by electrostaticdischarge.•

Page 42

11 Technical Data11.1 DC/AC11.1.1 SunnyBoy3000TL/ 3600TLDC InputSB3000TL-21 SB3600TL-21Maximum DC power at cosφ=1 3,200W 3,880WMaximum input

Page 43

SB3000TL-21 SB3600TL-21Maximum output current 16A 16ATotal harmonic distortion of the output currentwith total harmonic distortion of the AC volta

Page 44

SB4000TL-21 SB5000TL-21Initial input voltage 150V 150VMaximum input current, input A 15A 15AMaximum input current, input B 15A 15AMaximum shor

Page 45

13 Contact... 5514 EC Declaration of Conformity ...

Page 46

SB4000TL-21 SB5000TL-21Operating range at AC power frequency 60Hz 55Hz to65Hz 55Hz to65HzPower factor at rated power 1 1Displacement power fa

Page 47 - 11 Technical Data

Maximum data volume per inverter with Speed-wire/Webconnect550 MB/monthAdditional data volume when using the Sun-nyPortal live interface660 kB/hourTo

Page 48 - DC Input

Maximum permissible fuse protection forSB3600TL-2132AMaximum permissible fuse protection forSB4000TL-2132AMaximum permissible fuse protection forS

Page 49 - AC Output

Additional grounding 6.0NmSUNCLIX swivel nut 2.0NmRS485 communication or Speedwire/Webcon-nect connection1.5NmMultifunction relay connection 1.5Nm

Page 50 - 11.2 General Data

12 AccessoriesYou will find the accessories for your product in the following overview. If required, these can beordered from SMASolarTechnologyAG

Page 51 - 11.3 Protective Devices

13 ContactIf you have technical problems with our products, contact the SMAServiceLine. We need thefollowing information in order to provide you wit

Page 52 - 11.6 Torques

France SMA France S.A.S.LyonMedium Power SolutionsOnduleurs : +33472090440Communication : +33472090441Hybrid Energy SolutionsSunny Island : +3

Page 53 - 11.8 Data Storage Capacity

SMA Solar (Thailand) Co., Ltd. +6626706999대한민국 SMA Technology Korea Co., Ltd.서울+82-2-520-2666+9712234-6177 SMA Middle East LLC鲵뼑ꖱ霢꫑끭Ё೑࣫Ҁ/01,2349:

Page 54 - 12 Accessories

14 EC Declaration of Conformitywithin the meaning of the EC directives• 2004/108/EG (Electromagnetic compatibility, EMC)• 2006/95/EG (Low voltage dire

Page 56

1 Information on this Document1.1 ValidityThis document is valid for the following device types from firmware version2.55:• SB3000TL-21 (SunnyBoy3

Page 57 - 9:;*<+%,='3)>+%

SMA Solar Technologywww.SMA-Solar.com

Page 58

Document title and content Document type"Insulation Resistance (Riso) of Non-GalvanicallyIsolated PV Systems"Technical Information"Inte

Page 59

Complete designation Designation in this documentElectronic Solar Switch ESSSMA BLUETOOTH Wireless Technology BLUETOOTH1 Information on this DocumentS

Page 60 - SMA Solar Technology

2 Safety2.1 Intended UseThe SunnyBoy is a transformerless PV inverter with two MPP trackers which converts the directcurrent of the PV array to grid-