8 Configuration
8.1 Configuration Procedure
Once you have commissioned the PV system, you may have to adjust various settings via a
communication product. This section describes the procedure for configuration and gives an
overview of the steps you must perform in the prescribed order.
Procedure See
1. If you want to integrate the PV system into a Speedwire
network, connect the SunnyMultigate to the network.
Section8.2, page44
2. To manage the PV system data or to set the operating pa-
rameters, capture the SunnyMultigate in a communication
product.
Section8.3, page45 and
Section8.4, page46
3. Change the PV system time and PV system password. Manual of the communica-
tion product at www.SMA-
Solar.com
4. Check which country data set the SunnyMultigate is set
to.
Supplementary sheet with
default settings
5. If the country data set is not set correctly for your country
or your purpose, adjust to the required country data set.
Section8.6, page47
8.2 Connecting the Sunny Multigate to the Network
You can configure the Sunny Multigate and the inverters using an SMA communication product
(e.g. Sunny Portal, Sunny Explorer).
In order to register your PV system in Sunny Portal, you must connect the Sunny Multigate to the
local network.
Required material (not included in the scope of delivery):
☐ One network cable
Cable requirements:
The cable length and quality affect the quality of the signal. Observe the following cable
requirements.
☐ Cable type: 100BaseTx
SMA Solar Technology AG recommends cable type "SMACOMCAB-OUTxxx" for outdoor
use and cable type "SMACOMCAB-INxxx" for indoor use, available in lengths xxx = 100m,
200m, 500m, 1,000m
☐ Cable category: Cat5, Cat5e, Cat6, Cat6a or Cat7
☐ Plug type: RJ45 of Cat5, Cat5e, Cat6 or Cat6a
☐ Shielding: SF/UTP, S/UTP, SF/FTP or S/FTP
☐ Number of insulated conductor pairs and insulated conductor cross-section: at least
2x2x0.22mm²
8 Configuration
SMA Solar Technology AG
Installation ManualSMA-SB240-IA-en-1244
Comments to this Manuals