Danger to life due to electric shock
Do not disconnect or connect the AC field plug under load.
Only assemble the AC field plug in a dry environment.
Observe the operating temperature range of −40°Cto+85°C.
Cable requirements:
Cable cross-section: 2.5 mm²
Temperature-resistant up to at least +90°C
External diameter of the cable sheath: 9.6mm to 10mm
Number of stranded wires: 46
Cable type: copper wire, tin-plated
Wire cross-section: 0.25 mm²
Removing and reassembling the AC field plug is only possible within 72 hours
In total, the AC field plug may at maximum be removed three times and only within the
first 72hours after the first assembly.
After the period of 72hours has expired, the AC field plug must not be removed.
The cable must be shortened again before each assembly.
Only disconnect and disassemble the AC field plug following the instructions in this
document (see Section13.1 "Disconnecting the AC Field Plug", page64).
Procedure:
To assemble and connect the AC field plug, carry out the following steps in the given sequence. The
exact procedure is described in the paragraphs below.
Assembling the Cable
Premounting the AC Field Plug
Mounting the Insulator
Completing Mounting of the AC Field Plug
Assembling the Cable
1. Shorten the cable to the desired length using cable shears.
2. Dismantle the cable by 42 mm using the stripping knife. Take care not to damage the
individual insulated conductors.
3. Shorten L and N by 7mm.
6 Electrical Connection
SMA Solar Technology AG
Installation ManualSMA-SB240-IA-en-1234