Page view 107
Problem Cause and corrective measure
No inverters or not all inverters report
back with the version number of the
sent update file.
Due to missing DC input voltage to the inverters, an up-
date file has been sent and saved in the inverter but has
not yet been run. The DC input voltage can vary depend-
ing on the time of day, the weather or the condition of the
PV modules (e.g. pollution or covered with snow).
Corrective measures:
To start the update directly, perform a manual update
(see Section14.2.2, page80).
After five attempts, the update file could not be sent to the
inverters in the system.
Corrective measures:
Check the status of the Speedwire connection of the
inverters via the menu Instantaneous values >
System communication. Note that the Speedwire
connection may also be interrupted due to lack of
DC input voltage to the inverters. The DC input
voltage can vary depending on the time of day, the
weather or the condition of the PV modules (e.g.
pollution or covered with snow).
To start the update directly, perform a manual update
(see Section14.2.2, page80).
EnergyMeter
Problem Cause and corrective measure
The EnergyMeter is not displayed
by the ClusterController.
The network cable has not been correctly connected to the
EnergyMeter.
Corrective measures:
Make sure that the network cable is correctly connected
to the network terminal of the EnergyMeter (see
installation manual of EnergyMeter).
The EnergyMeter is not located in the Speedwire network.
Corrective measures:
Depending on the network topology of the system,
connect the EnergyMeter either to the router or network
switch of the Speedwire network, or directly to terminal
X9 or X10 of the ClusterController.
The EnergyMeter is supplying un-
realistic measured values.
The EnergyMeter has been installed the wrong way round.
Corrective measures:
Reconnect and recommission the EnergyMeter (see
installation manual of the EnergyMeter).
18 Troubleshooting
SMASolarTechnologyAG/ SMAAmerica,LLC
User ManualClusterController-BA-en-14108
Page view 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 117 118

Comments to this Manuals

No comments