OperatingManualSUNNY BOY 3600 / 5000 SMART ENERGYBATTERY PACK SMART ENERGYSB36-50SE-BE-en-11 | 98-112900.02 | Version 1.1AMERICAN ENGLISH
Danger to life due to high voltages on the BatteryPackLethal voltage is present at the pin connector for the power cable. Reaching into the pinconnec
Risk of burns due to hot enclosure partsSome parts of the enclosure can get hot during operation.• During operation, do not touch any parts other than
3 Scope of DeliveryCheck the scope of delivery for completeness and any externally visible damage. Contact yourdistributor if the scope of delivery is
4 Product Description4.1 SunnyBoy and BatteryPackThe inverter, the Battery Pack, the energy meters and if applicable, the Sunny Home Manager,togethe
Position DesignationF DisplayThe display shows the current operating data and events or errors.G LEDsThe LEDs indicate the operating state of the inve
Symbol ExplanationDangerThis symbol indicates that the inverter must be additionally grounded ifadditional grounding or equipotential bonding is requi
Symbols on the BatteryPackSymbol ExplanationDanger to life due to high voltagesThe BatteryPack operates at high voltages. All work on the Battery Pa
SMA Speedwire/WebconnectSMASpeedwire/Webconnect is a type of communication based on the Ethernet standard, andallows you to connect the inverter to a
The Sunny Boy Smart Energy uses the Battery Pack for intermediate storage of excess PV energy.The Sunny Boy Smart Energy and the Sunny Home Manager re
Position DesignationD SMA radio-controlled socketThe SMAradio-controlled socket supports load control in households with Sun-nyHomeManager. The SMA
Legal ProvisionsThe information contained in these documents is property of SMA Solar Technology AG. Anypublication, whether in whole or in part, requ
Sunny Boy Smart Energy and Energy MeterThe Sunny Boy Smart Energy optimizes self-consumption in the household by by intermediatestorage of excess PV e
Position DesignationF Router/network switchG Utility gridH Feed-in and purchased electricity meterI SMA Energy MeterMeasuring device which detects ele
5 Mounting5.1 Requirements for MountingRequirements for the mounting location:Danger to life due to fire or explosionDespite careful construction, ele
Dimensions for wall mounting:Figure 5: Dimensions of the wall mounting bracketRecommended clearances:Provided that the recommended clearances are obse
☐ Observe the recommended clearances to walls as well as to other inverters or objects.☐ If multiple inverters are mounted in areas with high ambient
5.2 Mounting the Inverter and Battery PackAdditionally required material (not included in the scope of delivery):☐ Five screws suitable for the suppor
Procedure:1. Ensure that no cables are laid in the wall which could be damaged when drilling holes.2.Risk of injury when drilling through the wall mou
6 Electrical Connection6.1 Overview of the Connection Areas6.1.1 View from BelowFigure 8: Connection areas and enclosure openings at the bottom of the
6.1.2 Interior ViewFigure 9: Connection areas in the interior of the inverterPosition DesignationA Rotary switch A for setting the country data setB R
Load-break switch and cable protection:Damage to the inverter due to the use of screw-type fuses as load-break switchesScrew-type fuses (e.g. DIAZED f
Table of Contents1 Information on this Document ... 62 Safety...
6.2.2 Connecting the Inverter to the Utility GridRequirements:☐ The connection requirements of the grid operator must be met.☐ The grid voltage must b
6.2.3 Connecting Additional GroundingIf local requirements stipulate the connection of additional grounding or equipotential bonding, youmust connect
6.3 Connecting the Network and SMA Energy MeterConnection options:Figure 10: Connection option: IntegratedStorageSystem (example)Figure 11: Connecti
Cable requirements:The cable length and quality affect the quality of the signal. Observe the following cablerequirements.☐ Cable type: 100BaseTx SMA
9. Route each network cable through a separateopening in the cable support sleeve.10. Lead the network cables through the cablegland M32x1.5 to the ne
Use of Y adapters for parallel connection of stringsThe Y adapters must not be used to interrupt the DC circuit.• Do not use the Y adapters in the imm
6.Damage to the inverter due to moisture ingressThe inverter is only properly sealed when all unused DC inputs are closed with DC connectorsand sealin
6.5 Connecting the Inverter and the BatteryPack1.Danger to life due to high voltages• Ensure that the inverter is disconnected from all voltage sourc
8.Danger of crushing if the Battery Pack is moved to its end position on the wallmounting bracket with a jerk• Grip the Battery Pack by the handles an
7 Commissioning7.1 ProcedureBefore you can commission the inverter, you must check various settings and make changes ifnecessary. This section describ
7.4 Self-Test in Accordance with CEI 0-21 for PV Systems ≤6 kW ... 417.4.1 Starting the Self-Test...
Procedure:1. Determine the rotary switch position for your country and purpose. To do this, consult theTechnical Information "Overview of the Rot
• Fit one conical spring washer to eachscrew. The grooved side of the conicalspring washer must point to the screw head.• Position the enclosure lid w
The self-test is only required for inverters to be commissioned in Italy. The Italian standard requiresthat all inverters feeding into the utility gri
Example: Display messages for overvoltage test- Name of the test: Autotest (59.S1) 240.00V- Disconnection value: Valore di soglia con 230.00V- Normati
8 Configuration8.1 ProcedureOnce you have commissioned the inverter, you may have to adjust various settings via the rotaryswitches in the inverter or
Procedure:1.Danger to life due to high voltages• Disconnect the inverter from all voltage sources and open the enclosure lid (seeSection10, page54).
8.4 Creating a Sunny Portal SystemRegistration data for detecting the inverter in Sunny PortalTo detect the inverter in Sunny Portal, you will need th
The operating parameters of the inverter are set to certain values by default. To optimize theperformance of the inverter, you can change the operatin
8.7 Setting the Active Power Limit at the Grid-ConnectionPointYou will only need to set the active power limit at the grid-connection point in systems
Default setting:• SB 3600SE-10: 100%• SB 5000SE-10: 100%Procedure:1. Ensure that the firmware version of the inverter is at least 2.4.0.R. If necessar
12 Accessories ... 6213 Contact...
8.11 Setting SMAOptiTracGlobalPeakFor partially shaded PV modules, you should set the interval at which the inverter is to optimize theMPP of the P
9 Operation9.1 LED SignalsThe LEDs indicate the operating state of the inverter.LED Status ExplanationGreen LED glowing Operationflashing The requirem
Position Symbol ExplanationD Active connection to a Speedwire networkActive connection to SunnyPortalMultifunction relay is activeThe operating tempe
Position Symbol ExplanationQ - Diagram with the power curve of the last 16 feed-in hours orthe energy yields of the last 16 days• In order to switch b
10 Disconnecting the Inverter from Voltage Sources1. Disconnect the circuit breaker and secure it against reconnection.2. If the multifunction relay i
9. Remove the data cable from the BatteryPack.Press the lateral brackets in and pull the plug outof the pin connector.10. Remove the power cable from
18. Ensure that no voltage is present on theACconnecting terminal plate between L and PEusing a suitable measuring device. Insert the testprobe into
11 Technical Data11.1 DC/ACDC InputSB 3600SE-10 SB 5000SE-10Maximum DC power at cos φ = 1 5,200W 6,600WMaximum input voltage 750V 750VMPP voltage
SB 3600SE-10 SB 5000SE-10Total harmonic distortion of the output cur-rent with total harmonic distortion of the ACvoltage <2%, and AC power >5
Length x width x height of the packaging of theprotective cover of the BatteryPack800mmx600mmx336mmTransport weight of the inverter 38kgTrans
1 Information on this DocumentValidityThis document is valid for the following device types from firmware version 2.3.35.R:• SB 3600SE-10 (Sunny Boy 3
11.3 Battery PackContinuous power 2 kWEffective capacity 2 kWhRated battery voltage 150 VBattery voltage range 120Vto166VMaximum charge current 12
SB 3600SE-10 SB 5000SE-10Maximum permissible fuse protection 32A 32AGround-fault monitoring Insulation monitoring: Riso> 400,000ΩInsulation mon
12 AccessoriesYou will find the accessories for your product in the following overview. If required, these can beordered from SMA Solar Technology AG
13 ContactIf you have technical problems with our products, contact the SMAServiceLine. We need thefollowing information in order to provide you wit
Deutschland SMA Solar Technology AGNiestetalMedium Power SolutionsWechselrichter: +495619522‑1499Kommunikation: +495619522‑2499SMA Online Service
România Vezi Česko (Cehia)Schweiz Siehe DeutschlandSlovensko pozri Česko (Česká republika)South Africa SMA Solar Technology South AfricaPty Ltd.Centur
14 EC Declaration of Conformitywithin the meaning of the EC directives• 2004/108/EG (Electromagnetic compatibility, EMC)• 2006/95/EG (Low voltage dire
SMA Solar Technologywww.SMA-Solar.com
Symbol ExplanationSections describing activities to be performed byqualified persons onlyInformation that is important for a specific topic orgoal, bu
2 Safety2.1 Intended UseThe inverter, the Battery Pack, the energy meters and if applicable, the SunnyHomeManager,make up a system for optimization
2.2 Skills of Qualified PersonsOnly qualified persons are allowed to perform the activities marked in this document with awarning symbol and the capti
Comments to this Manuals