Sma SB 3600SE-10 User Manual

Browse online or download User Manual for Equipment Sma SB 3600SE-10. SMA SB 3600SE-10 User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - BATTERY PACK SMART ENERGY

OperatingManualSUNNY BOY 3600 / 5000 SMART ENERGYBATTERY PACK SMART ENERGYSB36-50SE-BE-en-11 | 98-112900.02 | Version 1.1AMERICAN ENGLISH

Page 2 - Legal Provisions

Danger to life due to high voltages on the BatteryPackLethal voltage is present at the pin connector for the power cable. Reaching into the pinconnec

Page 3 - Table of Contents

Risk of burns due to hot enclosure partsSome parts of the enclosure can get hot during operation.• During operation, do not touch any parts other than

Page 4

3 Scope of DeliveryCheck the scope of delivery for completeness and any externally visible damage. Contact yourdistributor if the scope of delivery is

Page 5

4 Product Description4.1 SunnyBoy and BatteryPackThe inverter, the Battery Pack, the energy meters and if applicable, the Sunny Home Manager,togethe

Page 6 - Additional Information

Position DesignationF DisplayThe display shows the current operating data and events or errors.G LEDsThe LEDs indicate the operating state of the inve

Page 7 - Nomenclature

Symbol ExplanationDangerThis symbol indicates that the inverter must be additionally grounded ifadditional grounding or equipotential bonding is requi

Page 8

Symbols on the BatteryPackSymbol ExplanationDanger to life due to high voltagesThe BatteryPack operates at high voltages. All work on the Battery Pa

Page 9 - 2.3 Safety Precautions

SMA Speedwire/WebconnectSMASpeedwire/Webconnect is a type of communication based on the Ethernet standard, andallows you to connect the inverter to a

Page 10 - SMA Solar Technology AG

The Sunny Boy Smart Energy uses the Battery Pack for intermediate storage of excess PV energy.The Sunny Boy Smart Energy and the Sunny Home Manager re

Page 11

Position DesignationD SMA radio-controlled socketThe SMAradio-controlled socket supports load control in households with Sun-nyHomeManager. The SMA

Page 12 - 3 Scope of Delivery

Legal ProvisionsThe information contained in these documents is property of SMA Solar Technology AG. Anypublication, whether in whole or in part, requ

Page 13 - 4 Product Description

Sunny Boy Smart Energy and Energy MeterThe Sunny Boy Smart Energy optimizes self-consumption in the household by by intermediatestorage of excess PV e

Page 14

Position DesignationF Router/network switchG Utility gridH Feed-in and purchased electricity meterI SMA Energy MeterMeasuring device which detects ele

Page 15

5 Mounting5.1 Requirements for MountingRequirements for the mounting location:Danger to life due to fire or explosionDespite careful construction, ele

Page 16 - Symbols on the BatteryPack

Dimensions for wall mounting:Figure 5: Dimensions of the wall mounting bracketRecommended clearances:Provided that the recommended clearances are obse

Page 17 - 4.3 System Overview

☐ Observe the recommended clearances to walls as well as to other inverters or objects.☐ If multiple inverters are mounted in areas with high ambient

Page 18

5.2 Mounting the Inverter and Battery PackAdditionally required material (not included in the scope of delivery):☐ Five screws suitable for the suppor

Page 19

Procedure:1. Ensure that no cables are laid in the wall which could be damaged when drilling holes.2.Risk of injury when drilling through the wall mou

Page 20

6 Electrical Connection6.1 Overview of the Connection Areas6.1.1 View from BelowFigure 8: Connection areas and enclosure openings at the bottom of the

Page 21

6.1.2 Interior ViewFigure 9: Connection areas in the interior of the inverterPosition DesignationA Rotary switch A for setting the country data setB R

Page 22 - 5 Mounting

Load-break switch and cable protection:Damage to the inverter due to the use of screw-type fuses as load-break switchesScrew-type fuses (e.g. DIAZED f

Page 23

Table of Contents1 Information on this Document ... 62 Safety...

Page 24

6.2.2 Connecting the Inverter to the Utility GridRequirements:☐ The connection requirements of the grid operator must be met.☐ The grid voltage must b

Page 25

6.2.3 Connecting Additional GroundingIf local requirements stipulate the connection of additional grounding or equipotential bonding, youmust connect

Page 26

6.3 Connecting the Network and SMA Energy MeterConnection options:Figure 10: Connection option: IntegratedStorageSystem (example)Figure 11: Connecti

Page 27 - 6 Electrical Connection

Cable requirements:The cable length and quality affect the quality of the signal. Observe the following cablerequirements.☐ Cable type: 100BaseTx SMA

Page 28 - 6.2 AC Connection

9. Route each network cable through a separateopening in the cable support sleeve.10. Lead the network cables through the cablegland M32x1.5 to the ne

Page 29

Use of Y adapters for parallel connection of stringsThe Y adapters must not be used to interrupt the DC circuit.• Do not use the Y adapters in the imm

Page 30

6.Damage to the inverter due to moisture ingressThe inverter is only properly sealed when all unused DC inputs are closed with DC connectorsand sealin

Page 31

6.5 Connecting the Inverter and the BatteryPack1.Danger to life due to high voltages• Ensure that the inverter is disconnected from all voltage sourc

Page 32 - • Two network cables

8.Danger of crushing if the Battery Pack is moved to its end position on the wallmounting bracket with a jerk• Grip the Battery Pack by the handles an

Page 33

7 Commissioning7.1 ProcedureBefore you can commission the inverter, you must check various settings and make changes ifnecessary. This section describ

Page 34 - 6.4 DC Connection

7.4 Self-Test in Accordance with CEI 0-21 for PV Systems ≤6 kW ... 417.4.1 Starting the Self-Test...

Page 35 - 6.4.2 Connecting the PV Array

Procedure:1. Determine the rotary switch position for your country and purpose. To do this, consult theTechnical Information "Overview of the Rot

Page 36

• Fit one conical spring washer to eachscrew. The grooved side of the conicalspring washer must point to the screw head.• Position the enclosure lid w

Page 37

The self-test is only required for inverters to be commissioned in Italy. The Italian standard requiresthat all inverters feeding into the utility gri

Page 38

Example: Display messages for overvoltage test- Name of the test: Autotest (59.S1) 240.00V- Disconnection value: Valore di soglia con 230.00V- Normati

Page 39 - 7 Commissioning

8 Configuration8.1 ProcedureOnce you have commissioned the inverter, you may have to adjust various settings via the rotaryswitches in the inverter or

Page 40

Procedure:1.Danger to life due to high voltages• Disconnect the inverter from all voltage sources and open the enclosure lid (seeSection10, page54).

Page 41 - 7.4.1 Starting the Self-Test

8.4 Creating a Sunny Portal SystemRegistration data for detecting the inverter in Sunny PortalTo detect the inverter in Sunny Portal, you will need th

Page 42

The operating parameters of the inverter are set to certain values by default. To optimize theperformance of the inverter, you can change the operatin

Page 43

8.7 Setting the Active Power Limit at the Grid-ConnectionPointYou will only need to set the active power limit at the grid-connection point in systems

Page 44 - 8 Configuration

Default setting:• SB 3600SE-10: 100%• SB 5000SE-10: 100%Procedure:1. Ensure that the firmware version of the inverter is at least 2.4.0.R. If necessar

Page 45

12 Accessories ... 6213 Contact...

Page 46

8.11 Setting SMAOptiTracGlobalPeakFor partially shaded PV modules, you should set the interval at which the inverter is to optimize theMPP of the P

Page 47

9 Operation9.1 LED SignalsThe LEDs indicate the operating state of the inverter.LED Status ExplanationGreen LED glowing Operationflashing The requirem

Page 48 - Control Failure

Position Symbol ExplanationD Active connection to a Speedwire networkActive connection to SunnyPortalMultifunction relay is activeThe operating tempe

Page 49

Position Symbol ExplanationQ - Diagram with the power curve of the last 16 feed-in hours orthe energy yields of the last 16 days• In order to switch b

Page 50

10 Disconnecting the Inverter from Voltage Sources1. Disconnect the circuit breaker and secure it against reconnection.2. If the multifunction relay i

Page 51 - 9 Operation

9. Remove the data cable from the BatteryPack.Press the lateral brackets in and pull the plug outof the pin connector.10. Remove the power cable from

Page 52

18. Ensure that no voltage is present on theACconnecting terminal plate between L and PEusing a suitable measuring device. Insert the testprobe into

Page 53

11 Technical Data11.1 DC/ACDC InputSB 3600SE-10 SB 5000SE-10Maximum DC power at cos φ = 1 5,200W 6,600WMaximum input voltage 750V 750VMPP voltage

Page 54

SB 3600SE-10 SB 5000SE-10Total harmonic distortion of the output cur-rent with total harmonic distortion of the ACvoltage <2%, and AC power >5

Page 55

Length x width x height of the packaging of theprotective cover of the BatteryPack800mmx600mmx336mmTransport weight of the inverter 38kgTrans

Page 56

1 Information on this DocumentValidityThis document is valid for the following device types from firmware version 2.3.35.R:• SB 3600SE-10 (Sunny Boy 3

Page 57 - 11 Technical Data

11.3 Battery PackContinuous power 2 kWEffective capacity 2 kWhRated battery voltage 150 VBattery voltage range 120Vto166VMaximum charge current 12

Page 58 - 11.2 General Data

SB 3600SE-10 SB 5000SE-10Maximum permissible fuse protection 32A 32AGround-fault monitoring Insulation monitoring: Riso> 400,000ΩInsulation mon

Page 59

12 AccessoriesYou will find the accessories for your product in the following overview. If required, these can beordered from SMA Solar Technology AG

Page 60 - 11.4 Protective Devices

13 ContactIf you have technical problems with our products, contact the SMAServiceLine. We need thefollowing information in order to provide you wit

Page 61 - 11.8 Data Storage Capacity

Deutschland SMA Solar Technology AGNiestetalMedium Power SolutionsWechselrichter: +495619522‑1499Kommunikation: +495619522‑2499SMA Online Service

Page 62 - 12 Accessories

România Vezi Česko (Cehia)Schweiz Siehe DeutschlandSlovensko pozri Česko (Česká republika)South Africa SMA Solar Technology South AfricaPty Ltd.Centur

Page 63 - 13 Contact

14 EC Declaration of Conformitywithin the meaning of the EC directives• 2004/108/EG (Electromagnetic compatibility, EMC)• 2006/95/EG (Low voltage dire

Page 65 - 9:;*<+%,='3)>+%

SMA Solar Technologywww.SMA-Solar.com

Page 66

Symbol ExplanationSections describing activities to be performed byqualified persons onlyInformation that is important for a specific topic orgoal, bu

Page 67

2 Safety2.1 Intended UseThe inverter, the Battery Pack, the energy meters and if applicable, the SunnyHomeManager,make up a system for optimization

Page 68 - SMA Solar Technology

2.2 Skills of Qualified PersonsOnly qualified persons are allowed to perform the activities marked in this document with awarning symbol and the capti

Related models: SB 5000SE-10

Comments to this Manuals

No comments