MC_BOX_36-BE-en-20 | Version 2.0 ENGLISHOperating ManualMULTICLUSTER BOX 36
3 Scope of Delivery SMA Solar Technology AG10 MC_BOX_36-BE-en-20 Operating Manual3 Scope of DeliveryCheck the scope of delivery for completeness and
SMA Solar Technology AG 4 Additionally Required MaterialsOperating Manual MC_BOX_36-BE-en-20 114 Additionally Required MaterialsMaterial Number of u
5 Product Description SMA Solar Technology AG12 MC_BOX_36-BE-en-20 Operating Manual5 Product Description5.1 Multicluster Box 36The Multicluster Box
SMA Solar Technology AG 5 Product DescriptionOperating Manual MC_BOX_36-BE-en-20 13Symbols on the Type LabelSymbol ExplanationDanger to life due to h
6 Installation SMA Solar Technology AG14 MC_BOX_36-BE-en-20 Operating Manual6 Installation6.1 Choosing a Mounting LocationRequirements for the moun
SMA Solar Technology AG 6 InstallationOperating Manual MC_BOX_36-BE-en-20 15Observe minimum clearances:Figure3: Minimum clearancesObserve the permit
6 Installation SMA Solar Technology AG16 MC_BOX_36-BE-en-20 Operating Manual6.2 Preparing the Mounting LocationFigure5: Outside base measurements a
SMA Solar Technology AG 6 InstallationOperating Manual MC_BOX_36-BE-en-20 176.3 Transport6.3.1 Transport OptionsFigure6: Transport optionsThe Mult
6 Installation SMA Solar Technology AG18 MC_BOX_36-BE-en-20 Operating Manual2. In each corner, attach one lifting lug with one sealing disc (torque:
SMA Solar Technology AG 6 InstallationOperating Manual MC_BOX_36-BE-en-20 19Requirement:☐ When using a crane with hoist, the four lifting lugs must b
Legal Provisions SMA Solar Technology AG2 MC_BOX_36-BE-en-20 Operating ManualLegal ProvisionsThe information contained in this document is the propert
7 Electrical Connection SMA Solar Technology AG20 MC_BOX_36-BE-en-20 Operating Manual7 Electrical Connection7.1 Overview of the Connection Area7.1.
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 217.1.2 Cable Entries in the FloorFigure8: Cable entriesG Busbar
7 Electrical Connection SMA Solar Technology AG22 MC_BOX_36-BE-en-20 Operating Manual7.1.3 Grounding BusbarFigure9: Busbar for connecting the groun
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 237.3 Removing Protection against ContactFigure10: Positions of
7 Electrical Connection SMA Solar Technology AG24 MC_BOX_36-BE-en-20 Operating Manual7.4 Inserting and Preparing the Connection CablesAlways proceed
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 25Procedure:1. According to the type of cable routing and the inst
7 Electrical Connection SMA Solar Technology AG26 MC_BOX_36-BE-en-20 Operating Manual12. Turn the handle of the fuse holder up.13. Connect the ground
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 277.6 Connecting the LoadsThe line conductors of the loads are ro
7 Electrical Connection SMA Solar Technology AG28 MC_BOX_36-BE-en-20 Operating Manual5. Release the screws on the cover of the terminals and remove t
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 2913. Connect the neutral conductor to the busbar MC-X2 (AF 19, to
SMA Solar Technology AG Table of contentsOperating Manual MC_BOX_36-BE-en-20 3Table of contents1 Information on this Document. . . . . . . . . . . .
7 Electrical Connection SMA Solar Technology AG30 MC_BOX_36-BE-en-20 Operating ManualProcedure:1. Insert the connection cables in the Multicluster Bo
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 317.8 Connecting the Sunny Island InvertersAssignment of the Term
7 Electrical Connection SMA Solar Technology AG32 MC_BOX_36-BE-en-20 Operating Manual3. Remove the cover of the Sunny Island connection area.Retain c
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 33• Connect the master to the terminals Main Cluster Master as fol
7 Electrical Connection SMA Solar Technology AG34 MC_BOX_36-BE-en-20 Operating Manual7.10 Connecting the Control, Measuring and Data CablesThe Multic
SMA Solar Technology AG 7 Electrical ConnectionOperating Manual MC_BOX_36-BE-en-20 354. Plug the black data cable into the pin connector ComSync IN.5
8 Commissioning the Multicluster Box SMA Solar Technology AG36 MC_BOX_36-BE-en-20 Operating Manual8 Commissioning the Multicluster BoxRequirements:☐
SMA Solar Technology AG 9 Disconnecting the Multicluster System from Voltage SourcesOperating Manual MC_BOX_36-BE-en-20 379 Disconnecting the Multic
10 Maintenance SMA Solar Technology AG38 MC_BOX_36-BE-en-20 Operating Manual10 MaintenanceThe Multicluster Box must be serviced at regular intervals.
SMA Solar Technology AG 10 MaintenanceOperating Manual MC_BOX_36-BE-en-20 39Check the Multicluster Box for corrosion.• Use touch-up sticks, paint bru
Table of contents SMA Solar Technology AG4 MC_BOX_36-BE-en-20 Operating Manual7.9 Grounding the Multicluster System . . . . . . . . . . . . . . . . .
11 Decommissioning SMA Solar Technology AG40 MC_BOX_36-BE-en-20 Operating Manual11 Decommissioning11.1 Disassembling the Multicluster Box2. Remove al
SMA Solar Technology AG 12 Technical DataOperating Manual MC_BOX_36-BE-en-20 4112 Technical DataLoad ConnectionSunny Island ConnectionNumber 1 x thre
12 Technical Data SMA Solar Technology AG42 MC_BOX_36-BE-en-20 Operating ManualGenerator ConnectionPV Plant ConnectionGround ConnectionNumber 1 x thr
SMA Solar Technology AG 12 Technical DataOperating Manual MC_BOX_36-BE-en-20 43General DataNumber of line conductors 3Permitted grid configuration TN
13 Contact SMA Solar Technology AG44 MC_BOX_36-BE-en-20 Operating Manual13 ContactIf you have technical problems concerning our products, contact the
SMA Solar Technology AG 13 ContactOperating Manual MC_BOX_36-BE-en-20 45France SMA France S.A.S.LyonMedium Power SolutionsOnduleurs : Communication :
13 Contact SMA Solar Technology AG46 MC_BOX_36-BE-en-20 Operating ManualSMA Solar (Thailand) Co., Ltd. +66 2 670 6999대한민국 SMA Technology Korea Co., L
www.SMA-Solar.comSMA Solar Technology
SMA Solar Technology AG 1 Information on this DocumentOperating Manual MC_BOX_36-BE-en-20 51 Information on this DocumentValidityThis document is va
1 Information on this Document SMA Solar Technology AG6 MC_BOX_36-BE-en-20 Operating ManualAbbreviationsAbbreviation Designation ExplanationAC Altern
SMA Solar Technology AG 2 SafetyOperating Manual MC_BOX_36-BE-en-20 72 Safety2.1 Intended UseThe Multicluster Box is a component of the SMA multicl
2 Safety SMA Solar Technology AG8 MC_BOX_36-BE-en-20 Operating ManualDo not exceed the maximum AC connection power of the Multicluster Box.Only opera
SMA Solar Technology AG 2 SafetyOperating Manual MC_BOX_36-BE-en-20 92.3 Safety PrecautionsThis section contains safety precautions that must be obs
Comments to this Manuals